HPR ROV Logo

Heerema's massive new crane vessel passes sea trials

Rotation test with barge H-408 at 11,000 T above main deck
Rotation test with barge H-408 at 11,000 T above main deck

Dutch contractor Heerema’s new, LNG powered crane vessel has passed sea trials and load tests with flying colours.

Sleipnir reached a speed of 22.6 kilometres per hour and its cranes copes with loads of 11,000 tonnes each.

The vessel will soon commence its maiden voyage to southern Spain where it will be prepared for its first installation project in the Mediterranean.

11,000 Tonnes lifted in Sleipnir’s SB crane

Source link

W-Zero 1 Energy Transition Zone, Hareness Road, Altens, Aberdeen, AB12 3LE
crossmenuchevron-down
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram